Description
Sign in to access
Highlights
- Estimated the total gold resources at 2.24Mt tonnes at 1.48 g/t for 106,517 ounces at 0.6g/t Au cut-off in 370 surface and underground drill holes.
- Underground access and development. Open pit and underground mining potential. High grade ore shoots open at depth and along strike.
- Fine grained gold-granite related deposit, with excellent metallurgical recoveries, including heap leach.
- Satellite gold prospects not yet drilled in large land holding of Exploration Licence
|
Vendor Contact Details
Sign in to access
|